When we buy an accessory or a device for mechanical use, we need to install it in order to make the parts work on the machine. Of course, the installation of YUKEN vane pump static ring component is no exception.

Usually, when we buy an accessory or a device for mechanical use, we need to install it in order to make the parts work mechanically. Of course, the installation of YUKEN vane pump static ring component is no exception. What should we pay attention to when installing YUKEN vane pump static ring component? Today, Marlon, an engineer in the production department of Ltd, A&S Hydraulic Co., will give you a detailed introduction to the installation of YUKEN vane pump static ring components. The following points should be noted:

 

1. Insert the checked static ring seal ring from the tail of the static ring, and load the static ring assembly into the pressure cap or sealing chamber. Under no circumstances shall impact be exerted on mechanical seal parts or components. The pressed surface should be padded with clean cardboard or cloth to avoid damaging the sealing face.

2. After assembling a rotating dynamic ring assembly or a static ring assembly, manually press the compensation ring to check whether it is in place and flexible, and whether the elastic opening is positioned reliably.

3. Whether the perpendicularity of the seal end face to the axis or sleeve center line meets the requirements.

4. For static mechanical seals, the anti-duplication lead of the static ring assembly should be accurate. When pushing the static ring assembly, the groove of the component should be aligned with the pin. After pushing in place, the distance between the end face of the component and the end face of the sealing chamber should be measured to determine whether the assembly is in place or not.

5, When tightening the end cap with bolts, the force should be uniform and symmetrical. When tightening the end cap several times, it should not be tightened at one time, so as not to deflect or even crush the graphite ring.